The Kraken U.S. Patent Pending System Specs: 12 station (96” centers); 53′ Missile trailer 6 station (96″ centers) skid Instrumentation / Valve skid 4 sets of Ground Iron (4) Wellhead Interface skids (4) Adjustable Extension skids; 4′, 8′, 12’+ pups (4) Instrumentation Interface skids Directional Diverter (4-well) Rock Catcher Accessories for Interconnections Complies with: API 6A ANSI B16.5 AWSD 1.1 DNVD 2.7-1 Low Pressure:8×6 figure 206 split with rock catcherManual or electric wafer isolation valveMulti-port chemical injectionsWitch’s hat or GruvLok4, 6, or 8 station skids High Pressure: 150 BBL capability2.59 Bore 1502 union or resilient seal connections (standard)3.06 Bore hammerless connections (optional)Witch’s hat or GruvLokCheck valves or plug valves available (3″)